CRANE ENGINEERING / WITH IV-CONSULT

Engineering the replacement of a welded RMG rail.

Rail, clips, support plates and girder behaviour assessed before selecting a replacement rail system.

Engineering the replacement of a welded RMG rail. Original STARKON project photograph or drawing.
From the original STARKON project archive.

THE CHALLENGE

The starting point.

The original trolley rail was welded to the crane girder. Removing it would change the structural arrangement, so the replacement method needed an engineering assessment.

OUR SCOPE

What we delivered.

STARKON and IV-Consult reviewed the rail profile, clip arrangement, baseplate and deformation between supports. They also considered the girder with and without the welded rail, including strength and fatigue behaviour.

THE RESULT

The completed work.

The review led to a different rail and clip arrangement with prefabricated soleplates. The customer accepted the proposal and subsequently commissioned the replacement work.