THE CHALLENGE
The starting point.
The original trolley rail was welded to the crane girder. Removing it would change the structural arrangement, so the replacement method needed an engineering assessment.
CRANE ENGINEERING / WITH IV-CONSULT
Rail, clips, support plates and girder behaviour assessed before selecting a replacement rail system.

THE CHALLENGE
The original trolley rail was welded to the crane girder. Removing it would change the structural arrangement, so the replacement method needed an engineering assessment.
OUR SCOPE
STARKON and IV-Consult reviewed the rail profile, clip arrangement, baseplate and deformation between supports. They also considered the girder with and without the welded rail, including strength and fatigue behaviour.
THE RESULT
The review led to a different rail and clip arrangement with prefabricated soleplates. The customer accepted the proposal and subsequently commissioned the replacement work.