THE CHALLENGE
The starting point.
Sassevaart wanted to establish whether the maintenance portals would work as intended before future lock-gate maintenance. The trial needed to reveal practical access or support issues.
HANDLING SERVICE / TERNEUZEN
Installation and a full-load trial of the customer-designed maintenance portal arrangement.

THE CHALLENGE
Sassevaart wanted to establish whether the maintenance portals would work as intended before future lock-gate maintenance. The trial needed to reveal practical access or support issues.
OUR SCOPE
STARKON followed the customer’s installation plan and coordinated with the crane team to erect the portals. Once the lock gate was suspended, the dock was emptied to transfer the gate’s weight to the maintenance supports.
THE RESULT
The trial demonstrated a working maintenance arrangement. Preparation by the customer and close coordination during installation were central to the completed test.