PROJECT / ZEEBRUGGE
Four STS cranes raised by 9 metres in Zeebrugge
A successful crane raising project in Belgium, delivered in cooperation with ZPMC.
4STS cranes
+9 mHeight increase
ZeebruggeBelgium
ZPMCProject partner

Four cranes. Nine metres higher.
In Zeebrugge, Belgium, STARKON worked together with ZPMC to raise four ship-to-shore (STS) cranes by 9 metres. The project is a practical example of upgrading existing port equipment through close cooperation on site.
All four STS cranes were raised by 9 metres. A successfully completed project and a strong reference for STARKON’s crane upgrade services.
From the project site


STARKON on site
Our service vehicles alongside the cranes in Zeebrugge: a view of STARKON’s presence during the project.
Crane upgrades
Engineering, portal heightening and boom girder extensions for existing STS cranes.