
CRANE SERVICE / LIEBHERR / WHEEL ALIGNMENT
Restoring trolley tracking on a Liebherr STS crane.
Investigation and precision wheel alignment to resolve persistent trolley tracking problems and uneven flange wear.
View project ↗OUR WORK
Component deliveries, workshop preparation and work on site. Explore STARKON projects across crane service, crane parts and handling equipment.
26 projects

CRANE SERVICE / LIEBHERR / WHEEL ALIGNMENT
Investigation and precision wheel alignment to resolve persistent trolley tracking problems and uneven flange wear.
View project ↗
CRANE SERVICE / COSCO ZEEBRUGGE / 2022
Preventive steelwork reinforcement following a crane lifetime assessment, carried out around an operating rail terminal.
View project ↗
CRANE PARTS & SERVICE / RAIL SYSTEMS
Prefabricated soleplates, new rails, rail clip components and rubber underlays brought together for an RMG trolley rail replacement.
View project ↗
CRANE PARTS & SERVICE / ROTTERDAM / 2022
Replacement components, inspection and installation for a returning Rotterdam customer’s second and third cranes.
View project ↗
CRANE PARTS & WORKSHOP SERVICE / WHEELS
New shafts and bearings installed in existing gantry wheels, with workshop preparation and renewed preservation.
View project ↗
CRANE PARTS & SERVICE / TROLLEY TRUCKS
Trolley wheels, shafts, bearings and truck buffers replaced during a coordinated crane overhaul.
View project ↗
CRANE PARTS & SERVICE / GMP LE HAVRE
Design, production and replacement of A100 short rail components, combined with repair of the supporting rail bed.
View project ↗
CRANE ACCESS EQUIPMENT / DESIGN & FABRICATION
A purpose-built working platform developed for access to the trolley rails of ship-to-shore cranes.
View project ↗
MECHANICAL SERVICE / 2022
Bearing installation, bolted connections and bolt inspections carried out by STARKON technicians.
View project ↗
MECHANICAL SERVICE / SEVAN VEGA
Preventive inspection and alignment of the reel-drive shafts and couplings aboard Sevan Vega.
View project ↗
HANDLING SERVICE / TERNEUZEN
Installation and a full-load trial of the customer-designed maintenance portal arrangement.
View project ↗
CRANE ENGINEERING / WITH IV-CONSULT
Rail, clips, support plates and girder behaviour assessed before selecting a replacement rail system.
View project ↗
CRANE SERVICE / RAIL REPAIR
A targeted weld repair to address the worn joint that caused impacts during trolley travel.
View project ↗
CRANE SERVICE & PARTS / 2022
Production, supply and installation of short rail components for nine ZPMC cranes and two Reggiane cranes.
View project ↗
COIL HANDLING / PORT OF ANTWERP
Supplied for a long-standing customer in the Port of Antwerp: C-hooks for handling wire rod coils, each rated at 3,000 kg WLL.
View project ↗
STEEL SUPPORTS / DELIVERED IN ROTTERDAM
Eight bolt-connectable steel support stools delivered to a customer in Rotterdam. Each stool has a load capacity of 200 tonnes.
View project ↗
COIL TRANSPORT / DELIVERED EQUIPMENT
An economical coil transport solution for a suitable roll trailer. The removable adapter supports coils up to 33 tonnes each and is designed to follow trailer deflection. Remove it to make the deck available for other breakbulk cargo.
View project ↗
COIL HANDLING / DELIVERED EQUIPMENT
The supplied STHF-32T20FT-ETK lifting flat is built for coils with the eye facing upwards. The documented configuration is rated at 32,000 kg WLL and measures 6,000 × 2,500 × 2,300 mm. A dedicated flat-based solution for coil handling.
View project ↗
CUSTOM ENGINEERING / TRANSPORT & STORAGE
A custom transport and storage frame for a 50-tonne-rated lifting beam, designed for breakbulk handling. STARKON covered engineering, fabrication, finishing and delivery. The 50-tonne figure describes the beam rating, not the storage frame capacity.
View project ↗
TERMINAL EQUIPMENT / CONTAINER CLEANING
A series of custom liquid containment trays and racks delivered to a Belgian container terminal. The equipment collects residual liquids during cleaning, ready for pumping, treatment and disposal through the terminal’s process.
View project ↗
FORKLIFT ATTACHMENTS / WIDE LOADS
Fork spreader frames increase fork spacing for wide and oversized cargo. STARKON introduced 12- and 25-tonne configurations, with custom engineering around the application. This original engineering view shows the 12-tonne version.
View project ↗
SERVICE / REFURBISHMENT
For a valued long-standing customer, we inspected and repaired the complete steel structures, fully replaced the lifting lugs and applied a new protective coating and markings.
View project ↗
SERVICE / ROLLTRAILER REPAIR
A rolltrailer repair scope can include much more than the visible deck. The project records cover timber deck replacement, support-beam repairs, wheel-hub covers and attention to running gear. These detail photographs show the structure and components that inform the repair work.
View project ↗
FABRICATION / LOADING ACCESS
A custom 40-tonne heavy-duty ramp delivered to a container terminal in Zeebrugge, Belgium. The photographs show fabrication and the completed equipment; loading and operating conditions remain specific to this unit.
View project ↗
EQUIPMENT / IN OPERATION
Six complete sets of forklift coil handling attachments supplied for the Port of Antwerp. Different configurations ranged from 3 to 14 tonnes, covering yard movements, truck loading and unloading, and container handling.
View project ↗
REFURBISHMENT / TERMINAL EQUIPMENT
A personnel lifting platform refurbishment with an upgraded anti-slip floor, self-closing doors and renewed finishing. The before-and-after photographs show the work on the platform structure and guardrails.
View project ↗